Upgraded Quilt Filling Machine: Greater Flexibility & Higher Throughput

Our upgraded quilt filling machine introduces practical refinements built on the proven base model, directly addressing factory efficiency, operator comfort and lead-time pressure for bedding manufacturers.
The most notable upgrade is the 360° rotating PLC control head. Operators can shift the HMI/PLC unit to their working side freely instead of adjusting positions around the machine. This eliminates awkward reaching, cuts fatigue and supports smoother single-person operation over long shifts.
We have enlarged the worktable to accommodate larger quilt shells. A non-slip safety fence is fitted to prevent fabric slippage during grid-by-grid filling, keeping alignment consistent and reducing rework caused by shifting covers.
The machine retains our reliable 1-nozzle, 4-scale cyclic weighing configuration. Continuous weighing cycles feed the single filling nozzle steadily, delivering faster throughput. Under normal conditions, one quilted grid quilt can be finished every 2 to 3 minutes. Steady weight cycling improves consistency while raising daily output without extra staffing.
We also streamlined pre-shipment procedures. Once factory testing completes, the unit can be disassembled and shipped on the same day. There is no unnecessary hold-up after inspection, so clients receive equipment sooner and start production faster.
These updates target real workshop pain points: easier human-machine interaction, better fabric handling, stable speed and shorter wait times. For factories producing quilted bedding in batches, the upgrade balances operational ergonomics, filling accuracy and capital turnover.

duvet weighing filling machine (6)
duvet weighing filling machine (1)
duvet weighing filling machine (2)
duvet weighing filling machine (3)
duvet weighing filling machine (4)
duvet weighing filling machine (7)
duvet weighing filling machine (5)

Post time: Jul-31-2026